Forty feet of track went down before the caboose did.
The caboose was a gift for Janae, and Michael kept the search from her. It was a couple of years between starting the search and surprising her.
It came from Yanke Machine Shop in southeast Boise. It was a crew car, with quarters where the crew slept. Janae grew up around the railroad.
Before the caboose could come, it needed rails. Michael and his sister built the track themselves. They studied the template at the Boise Train Depot first.
The oldest photos we have of it are from August 2022. On August 23 the ties were down and a dump truck was backing over them with gravel. The rails went in that same day. By June 8, 2023 the track was done.
Janae was on a vacation in Oregon while Michael built the track. When she got back she met him at the tracks. That is how she found out. Then he told her about the train, and we drove out to the Yanke field to go see it.
We had spent almost twenty five years finding ways we were not compatible on projects. This one was a commitment, from Michael anyway, that we could work together. That we will work together. That we would keep finding ways to work together on them.
The track is forty feet of original railroad track on Woodlawn Avenue in Boise's West End. The caboose is 35 feet 6 inches long, 9 feet 6 inches wide and 16 feet 8 inches tall.


August 6, 2022. Michael on a railroad track at sunset.
August 6, 2022. A small tracked machine working along the site.
August 23, 2022. A dump truck backs over the new ties.
August 23, 2022. Rails laid in the gravel.
June 8, 2023. The finished track.
Two queen beds, one raised in the cupola. Dual cast iron hot tubs. Pick your dates and book direct.
See The Boise Jewell and book