The Boise Jewell caboose
The storyStay in the cabooseLogo and brandjanaeandmichael.com

How we built the track and surprised Janae with a caboose

Forty feet of track went down before the caboose did.

The caboose Michael kept secret

The caboose was a gift for Janae, and Michael kept the search from her. It was a couple of years between starting the search and surprising her.

It came from Yanke Machine Shop in southeast Boise. It was a crew car, with quarters where the crew slept. Janae grew up around the railroad.

Building the track

Before the caboose could come, it needed rails. Michael and his sister built the track themselves. They studied the template at the Boise Train Depot first.

The oldest photos we have of it are from August 2022. On August 23 the ties were down and a dump truck was backing over them with gravel. The rails went in that same day. By June 8, 2023 the track was done.

Janae was on a vacation in Oregon while Michael built the track. When she got back she met him at the tracks. That is how she found out. Then he told her about the train, and we drove out to the Yanke field to go see it.

Why it mattered

We had spent almost twenty five years finding ways we were not compatible on projects. This one was a commitment, from Michael anyway, that we could work together. That we will work together. That we would keep finding ways to work together on them.

The track is forty feet of original railroad track on Woodlawn Avenue in Boise's West End. The caboose is 35 feet 6 inches long, 9 feet 6 inches wide and 16 feet 8 inches tall.

The day the caboose arrived

A dump truck backing over the new railroad ties and rails in the gravel

Stay in the caboose

Two queen beds, one raised in the cupola. Dual cast iron hot tubs. Pick your dates and book direct.

See The Boise Jewell and book